If so, what would I use? I am sure you probably already have, but I would go back to the respective manufacturers installation documents and/or contact them directly with your situation and get their guidance. We excavated the old floor and dirt put in a layer of gravel, French drains and a sump pump and then covered with a 14mm vapor barrier. I will paint it with Drylok first, however would a plastic sheet placed under the carpet padding or vinyl planks be appropriate? If youve ever had a problem with a basement floor (or any concrete floor), you know the kind of damage that too much moisture can cause. What options do I have for vapor barriers/vapor mitigation? Is there something I need to be aware of and watching for in having a concrete floor as my flooring? I have even allowed the new laminate flooring to acclimate to my house for over a month. Thanks for the question. no secondary barrier has been insulated on top of the insulation ive been informed from my building inspector it isnt a building requirement just a manufacture requirement. There are a million ways to skin a cat and I would definitely start with checking your local building codes for acceptability of anything you do. Size is 670 so ft. Any ideas? Thank you for the question. The cooler is sitting on a bare slab appx 6x16. With the French drains, this may not be as critical, but you will usually see uniform coverage in a vapor retarder. Would you also put on expansion joint in? any suggestions would be greatly appreciated. I am pouring a concrete slab under a pavilion. What is your thoughts on this? Thanks for the question. Thank you. Should you continue living in a home where no moisture barrier was used when you have already experienced mildew smell? They arent the only game out there, but it is a place to start. Required fields are marked *. Dan, Thanks for the questions. Of course, ACI isnt necessarily the end all, be all in the construction specification world. First and foremost, follow the manufacturers recommendations for a proper, warrantable installationincluding installing the 6 mil. I live in East TN and have a pole barn that I will be pouring concrete into soon and building into a residential space. Thanks for the questions. Pick an area that seems to have the worst issues, prep the area thoroughly, and apply the epoxy paint. After about a year, they noticed small pimple like defects in the wood, in a few boards in the office. Im inclined to trust him, but what do you think? He feels we need to consult with a foundation expert. I have been told to fold it upwards at the perimiter a couple inches, bringing it up in front of the baseboard, and then attaching quarter round against it. This is great for finishing, but not good for the overall health of the finish that will be installed on the surface of the concrete. Hello, We have a partial concrete slab that we are planning to subfloor over to make a level floor throughout the house. Dont know which way to go! So now Floor & Decor told us to get the issue fixed before they come out and install another floor. I am not sure about the moisture being trapped in the foam, but there is a distinct possibility that the moisture could be because of some air quality issues. Is the mold really an issue if it is not disturbed? Putting this down prior to the tile may help alleviate some, if not all, of the issues. I just hit him up on Twitter and I am hoping he will help us out. Question for you. there are 2 20 wide and 1 4 wide 8 deep food trough that are in the floor. Thank you. Im just more concerned with prevention of mold growth and moisture. The best way to accomplish that is with a vapor barrier under the slab. You may also want to investigate products like these: https://www.schluter.com/schluter-us/en_US/Membranes/Uncoupling-%28DITRA%29/Schluter%C2%AE-DITRA-%26-DITRA-XL/p/DITRA, http://www.ardexamericas.com/en-us/Products/tilestone/Pages/ARDEX-UI-720.aspx. We have had several hardwood floor contractors out to bid putting in new floors. He then closed up the hole with concrete and she put down bamboo flooring thoughout thehouse. It sounds like you may have a traditional mortar bed installation here. Potentially, the area around the perimeter of the floor may not be as well insulated as the rest of the floor and so that variation may be part of the issue. Thanks! If yes, then what were the moisture testing results? Thanks for the comments. These low permeability materials completely eliminate any moisture migration from the ground, allowing the slab to dry out much more quickly and to stay dry. 2). Im desperate for resolution. Dan Marks Technical Director (949) 325-2035. not even 2 weeks later the entire floor started to buckle. Our neighbors dont get dampness and wetness in their garages when it is humid out. Building a Lake house and we are concerned that our builder forgot to place the vapor barrier down prior to the pour of the slab. Thanks much for your help. Im I right or am wrong this guy has really screwed me on this the form he built wasnt strong enough to hold so the top of the form is push out 3 inches from the bottom there a spot in the middle of the slab that holds water this guy thinks hes going to get paid for this he got the first draw hes not getting anything else. Would a vapor barrier padding prevent this or would it just keep the mold on one side of the barrier? I have had it fixed several times and each time it all comes back. This may help you understand better. Based on the fact that two sides will be open and that the finished floor will be the actual concrete, I see no real reason to have the vapor retarder. They are a network of flooring inspectors. As moisture makes its way to the surface of a concrete slab, soluble alkalies come along for the ride and raise its surface pH above that of flooring adhesives. The adhesive was supposed to be a 2 in 1 adhesive/vapor barrier product. Shouldnt a vapor barrier be installed for moisture and radon? The floor level is techinically 15 above grade the way our yard slopes. The existing mat slab does not have a vapor barrier, and Im proposing a vapor barrier above the mat slab along with sleepers and rigid insulation. Which would be better? The slab is in fine condition. And is engineered hardwood any better? In a small 5 x 5 toilet room in the master bath, we took up clay tile, In order to tile the whole bathroom Including this separate toilet room with matching tile instead of re-installing carpet. Breathability for the concrete is fine, but the issue is where the quiet walk has too much breathability for the flooring product. It will eventually be turned into a music room with climate control, flooring, etc.. Thanks for the question. Or would a poly modified medium bed thinset be sufficient? Having that vapor retarder on top tends to lessen any issues associated with moisture and the finish. I have had efflorescence issues really bad with white dots coming up all over the patio. Hi Jason I have a 2yr old concrete slab with Spray Polyurethane Foam sprayed underneath to act as a vapour barrier. Thanks for the comment. My question is whether a vapor barrier should be installed under this footing, I assume so, but do we need to bring the barrier up the sides of the hole also? If there is a vapor barrier under the concrete slab in my house, and the laminate installers put a vapor barrier on top of the slab, before installing the laminate, will this not trap moisture in the concrete? Is the pavilion fully enclosed with doors and windows? Too much moisture in concrete is a problem because it can cause pH changes that destroy adhesives. Capillary breaks do a good job of stopping water in its liquid state from reaching a slab. We purchased our home 4 years ago. Because the concrete slab is floating thats how basements are built in Canada if moisture was to penetrate between the slab and vapour barrier, would that compromise the concrete slab over time? I have a problem with my walk-in-beer cooler located in a convenience store in W. TN. This leads me to believe its condensation. Do you have any suggestions on ways to reinforce the vapor barrier to make sure that its not punctured and OK for me to use as a storage space? Now, that being said, the incremental amount of money and time it would cost to do something like this seems to be slight in comparison to the scope of the entire project. I see your mention of epoxy moisture mitigation in a previous post here, but because the surface is so uneven, Im not clear on whether thats an option or not. Good luck. If I pull up floor, lay plastic and put new flooring down is there a risk of mold growing between concrete and vapour barrier? Thanks for the question. Thanks for the comment. Also, in some of the inquiries I read about smells, and radon. Being that this is a very specific, unique question, I am enrolling help from one of my industry counterparts from Stego. Good luck. Good Blessed afternoon, I have a 50x40 heated garage, which is also heated, insulated and drywalled (walls & ceiling), its 92 outside On top of the 6 concrete floor w/ wire mesh, I also installed 12x12 porcelain tiles. A concrete vapor barrier is any material that prevents moisture from entering a concrete slab. We could find no reason (roof leak, plumbing leak, wall leak, etc.) We put down laminate flooring that is now warped. On the other hand, the sheet also helps to ensure there is a break between the blotter layer and the concrete to keep groundwater from entering the slab later in its life. The hardening process of concrete is a chemical reaction between the cementing material and water. Thank you. The crawl space fan is good, but I would also look at how much ventilation there is to the outside. 516 meters, to use for storage and a place to do things like work on the lawnmower, thickness plane wood, etc.. I believe were now getting condensation between the plastic and the cement. I am working on a project and the exiting mat slab is maintained and will have a new foundation next to it. Is it possible that a temperature difference between the slab and room above the wood is causing condensation to build up under the floor? Both of these are flooring industry-accepted methods for concrete moisture testing. hello, how are you hope you will be fine. Could this odor be caused from the moisture coming from the cement and trapped in the foam underlayment? Well, I can say that having issues on concrete slabs, other than the ground floor, is more common than you would think. Thanks. Make sure the one you chose covers slabs that DONT have a vapor retarder below. my issue is moisture. Especially due to this being a flooding situation, I think the sealer is warranted. The foundation walls were constructed in 1990, there does not appear to be any moisture leakage through any of the sections of concrete. Thanks for the comment. I would test via a Calcium Chloride test or a relative humidity test like the Rapid RH test. Hi Jason, I have a basement concrete slab on grade that is 30 years old. Front-line technology produces an extensive line of water repellent products. Please help!! Our luxury vinyl floor was laid directly on top of it. Thanks for the comments. If you just going to leave it as concrete, cosmetically, for now and the future, most probably wouldnt utilize a vapor retarder. My uncle had the cooler installed appx 10 to 15 years ago. You need to know how bad the problem is before you can determine the solution. Thanks Tracy. We used treated joists (but not treated sub flooring and cheap pine hardwood tongue and groove, I hate pine). Within 2 months have orange coloured crystals growing through seams. ft/24 hours in 82 days with a vapor barrier, compared to 144 days when exposed to vapor from below. Do I run the vapor barrier thats on top of the mat slab over the new foundation as well? I have a 40 X 20 pole-barn type building with a concrete floor, it was probably built in the mid 70s. Yet, we are still reading 100% on the concrete slab in the dining room. I also thought about using a spray foam on the exposed slab and between crevices and on the wood joists in that area, but everything is too wet/ damp. Good luck. You might need an even thicker barrier though if youre covering material with sharp angles. After that I think I would be inclined to contact a flooring inspector at NICFI.org to get their unbiased opinion. He did and the moisture level was at 100%. I had someone come out to test for moisture and they found pockets of high moisture throughout the house wherever the wood floor shows the defects. Is this existing construction? You have a lot going on here and many are moving variables. Im concerned that a vapor barrier would trap moisture underneath it. Thin plastic like this is often called a vapor retardermeaning it slows the vapor down but doesn't stop it. From what I hear, epoxy paint does tend to be a bit more durable in situations like this. Radon is the second leading cause of lung cancer in the U.S., according to the American Lung Association. Read more about moisture coming up through concrete, including how to test for moisture vapor transmission. In there, they should spell out concrete moisture maximums. Here are some things I can add for you to think about though: 1. The subfloor will consist of 2 X 6 joists about 1 inch off the slab. If that fails, I would track down a flooring sundry distributor in your area and ask them about concrete moisture mitigation options. Home The Rapid RH Concrete Moisture Test Concrete Information & Knowledge Base Subfloor Moisture Concrete Vapor Barriers: Everything You Need to Know. Hello, thanks for this article! should i cover the cement ground using poly tarp ? I had heard of vapor barrier problems and wondered if this could be the reason behind these problems. was not leveled at all. Vapor barriers are less permeable than vapor retarders. Your thoughts would greatly be appreciated. It needs to dry and then stay dry to avoid flooring problems. You really need to look at the permeability specs on the Spray Polyurethane Foam to determine if it is an effective vapor retarder. Will I have to tear out concrete and start from scratch & be sure to add a vapor barrier, what will be the proper steps to take before pouring the concrete? If the problem persists or is bad enough, you may want to reach out to https://www.nicfi.org/ and see if there is a qualified tile inspector in your area. Bottom line: Vapor barriers need to be strong enough so they dont easily puncture. i recently started a renovation and i decided i wanted to pour cement over the whole crawl space. Toby: Thanks for the questions. Due to expenses of resident turnover, they decided to remove carpet/pad/tack and replace with sheet vinyl everywhere excluding Bedrooms, on the first floor for each of the properties. Here are the parameters: Materials can be separated into four general classes based on their permeance: Vapor impermeable: 0.1 perms or less Vapor semi-impermeable: 1.0 perms or less and greater than 0.1 perm Vapor semi-permeable: 10 perms or less and greater than 1.0 perm Vapor permeable: greater than 10 perms. Upon inspection I discovered that there was no vapor barrier installed over the OSB siding used to cover the stick built area. What could be causing this? Hi Jason, I live in Las Vegas where it is hot and dry. Specifics of the entire construction process for radiant heat are going to be out of wheelhouse. Avoiding moisture-related problems with concrete sealers: Reducing bond failures caused by moisture- vapor transmission, Don't let water vapor delaminate your overlay, W. R. MEADOWS White Paper - Tips on Choosing Vapor Barriers. Thanks for the comment. I would reach out to an organization like http://www.nicfi.org/. This could be something as simple as varying temperatures and condensation forming on the tile. I would expect that you can successfully install carpet in this situation (or any other flooring product), but it is going to require that you find someone knowledgeable to work with that acknowledges the challenges you face in this application.

Baby Strollers For Sale Near Bengaluru, Karnataka, Mr Sushi Menu Near Budakeszi, Hawaiian Opal Necklace, Cherry Cube Organizer, La Roche-posay Lotion Face, Clip On Water Bottle Holder For Bike, Hmlyn Insulated Jacket,